Otal Constructions supplied and installed 50m2 of 133×33 spotted gum hardwood decking around the rooftop pool, joists and sub floor, complete with a non slip coating. Adjustable joist supports had to be installed to allow for movement from the pool.
Otal Constructions supplied and installed 50m2 of 133×33 spotted gum hardwood decking around the rooftop pool, joists and sub floor, complete with a non slip coating. Adjustable joist supports had to be installed to allow for movement from the pool.
Otal Constructions supplied and installed custom steel brackets and blackbutt hardwood timber seating to the entrance and common areas of Arklife Living.